Warning: Undefined array key "fr" in /home/swecogroup/public_html/wp-content/plugins/the-sweco-plugin/includes/rewrite-post-slug.php on line 75

Casa Ferrero – Global Headquarters

The Ferrero Group has chosen to establish its global headquarters next to Luxembourg Airport, moving into the building known as Casa Ferrero.

Client
Ferrero International
Partners
Félix Giorgetti & Besix Red Lux, Best Ingénieurs-Conseils
Scope
Mission complète techniques spéciales
Project dates
2015-2019
Gross floor area
35.000 m²
Gross volume
143.482 m³

The new global headquarters of Ferrero in Niederanven

The new world headquarters of the Italian confectionery company Ferrero is located in Niederanven and offers nearly 30,000 m² above ground. Ferrero’s aim was to create an elegant, timeless, and highly efficient building. The choice of Findel, close to the airport, was essential, as teams receive daily visitors from numerous countries.

Architecture designed for conviviality and functionality

Following the site’s natural slope, the building consists of two wings—a rectangle and an inverted L—connected by a vast atrium. This atrium, covered by an 800 m² glass roof, is designed as a village square, bringing together all the company’s communal life and circulation areas, including freeform walkways positioned in an offset layout.

An integrated and efficient energy system

Heating is supplied via a connection to Luxembourg City’s district heating network. Treated air is distributed through main technical ducts (one per zone) and is diffused either by round floor-integrated outlets in the raised floors of the various levels or by fan coil units installed along the facades. To ensure maximum flexibility for partition layouts, these fan coil units are positioned at the facades and fully integrated into their architectural lines.

Modern and flexible cooling system

Cooling for the administrative areas is provided via chilled ceiling islands, with the overall system supplemented by a supply of treated air.
This supply not only delivers the required fresh hygienic air but also removes part of the excess heat and dehumidifies the indoor environment.

A BBB-certified building looking to the future

Certified BBB, the building will also be equipped with solar panels, with all rooftop technical equipment completely concealed from street view.

A new hub for Ferrero’s teams

Ferrero’s teams, previously spread across five sites, are now gathered in this new headquarters, which can accommodate between 1,200 and 1,400 workstations depending on the chosen layout.
An additional 5,000 m² will be built soon, enabling the company—which continues to grow—to welcome even more employees.

How can we help you?

A team of experts is ready to support you and explore how we can assist with your request. When you submit this form, someone from our team will contact you. This form is intended solely to request more information about our Sweco business solutions.
  • Drop files here or
    Max. file size: 50 MB.